Building Stronger Foundations with Advanced Pier Systems
When constructing a new home, commercial building, or any other structure, foundation stability is crucial. Many properties are built on unstable or expansive soils that can cause settling, shifting, and long-term structural issues. Without proper reinforcement, new foundations may develop cracks, sink, or become misaligned over time.
At Combined Locks Foundation Repair, we specialize in pre-construction pier installation in Combined Locks, WI, providing reinforced foundation support before the building process begins. Our helical piers and steel push piers are installed deep into stable soil layers, ensuring maximum load-bearing capacity and preventing future settlement or foundation failure.
Our Services
- Concrete Slab Foundation Repair
- Pier and Beam or Block and Base Foundation Repair
- Basement Wall Repair
- Basement Waterproofing
- Cracked Wall / Structural Repair
- Drainage Services and Repair
- House Raising / Lifting
- House Leveling
- Retaining Wall Repair
- Polyurethane Foam Injection
- Commercial Foundation Repair
- Void Filling
- Steel Push Pier Installation
- Slab Pier Installation
- Helical Pier Installation
- Helical Deck Pier Installation
- Pre-Construction Pier Installation
- Foundation Wall Repair
- EverBrace™ Wall Restoration System
- CarbonArmor Wall Stabilization
- GeoLock Wall Anchor System
- PowerBrace Foundation Wall Support

How Pre-Construction Pier Installation Works
Pre-construction piers are designed to support structures from the ground up, ensuring stability before construction begins. Our comprehensive installation process includes:
1. Site Evaluation and Soil Analysis
- A thorough assessment of soil stability and load-bearing capacity.
- Identification of expansive clay, loose fill, or moisture-sensitive soil conditions.
- A custom pier installation plan is developed based on the structure’s weight and foundation requirements.
2. Pier Installation and Load Testing
Helical Pier Installation
- Helical piers are screwed deep into stable soil layers, providing strong support for foundation footings.
- Their threaded design allows for easy load distribution, reducing settlement risks.
Steel Push Pier Installation
- Hydraulically driven steel push piers are installed until they reach load-bearing strata.
- Ideal for heavier commercial and industrial structures requiring deep support.
3. Final Adjustments and Foundation Preparation
- Once installed, the piers are load-tested to verify strength and stability.
- The foundation is built directly on the piers, preventing future sinking or shifting.

Benefits of Pre-Construction Pier Installation
Installing foundation piers before construction begins provides long-term structural advantages:
✔ Prevents Foundation Settlement – Anchors structures to deep, stable soil layers, eliminating shifting.
✔ Enhances Load-Bearing Capacity – Ensures the foundation can support heavy structural loads.
✔ Works in All Soil Conditions – Effective for expansive clay, loose sand, and high-moisture areas.
✔ Reduces Future Foundation Repairs – Minimizes cracking, sinking, and structural adjustments.
✔ Increases Property Value – A reinforced foundation improves resale value and longevity.
By installing pre-construction piers, homeowners and developers prevent costly foundation problems before they start.

What to Expect During Pre-Construction Pier Installation
Our step-by-step process ensures foundation stability before construction begins:
* Step 1: Comprehensive site inspection and soil analysis.
* Step 2: Engineering and load calculations for pier placement.
* Step 3: Hydraulic installation of helical or steel push piers to reach stable soil.
* Step 4: Load testing and foundation preparation for construction.
* Step 5: Final inspection and verification of foundation strength.
This process ensures a strong, level foundation ready for building.

Cost of Pre-Construction Pier Installation in Combined Locks, WI
The cost of installing pre-construction piers varies based on:
- Size of the structure – Larger buildings require more piers for even load distribution.
- Type of piers used – Helical piers vs. steel push piers have different material and labor costs.
- Depth of stable soil – Deeper installations require more pier sections.
- Soil conditions and load requirements – Unstable soils may require additional reinforcements.
* Typical pre-construction pier installation costs range from $4,000 to $25,000, but a free on-site inspection provides an exact estimate.
FAQs About Pre-Construction Pier Installation
1. How long does pre-construction pier installation take?
Most projects take two to five days, depending on the number of piers required.
2. Are pre-construction piers necessary for all new buildings?
Not always, but they are highly recommended for unstable soils, heavy structures, and flood-prone areas.
3. Can pre-construction piers be used for residential and commercial projects?
Yes, they are ideal for homes, businesses, industrial buildings, and large structures.
4. Will pre-construction piers prevent foundation cracking?
Yes, by anchoring the foundation to stable soil layers, they eliminate common settling issues.
Looking for Pre-Construction Pier Installation Near Me?
At Combined Locks Foundation Repair, we provide expert pre-construction pier installation services in Combined Locks, WI. If you’re planning to build a new home, office, or commercial property, contact us today for a free inspection and pier installation estimate.